Meeting Cost Calculator

Put a number on a recurring meeting. Enter how many people attend, an average hourly cost and how long it runs, and the page converts that into a total, a per-minute figure and a per-person share that is specific enough to change behaviour.

Three Layers of Cost

The base figure is easy: people multiplied by hourly rate multiplied by hours. What makes the number interesting is the two multipliers layered on top of it. The overhead multiplier accounts for the fact that an employee costs considerably more than their salary, and the opportunity cost multiplier accounts for the work those people are not doing while they sit in the room. Both are optional, and both are usually larger than people expect.

Getting a Number You Can Present

  1. Count the attendees. Include anyone whose time is genuinely consumed, including people who only dial in for part of it — if they are there, they are not doing something else.
  2. Enter an average hourly cost. If you know fully loaded internal costs, use those, because that is what the overhead multiplier is modelling. If you only have salaries, divide the annual figure by roughly 2,000 working hours and let the overhead setting do the rest.
  3. Enter the duration in hours, using a decimal for part-hours. A 45-minute meeting is 0.75.
  4. Choose an overhead level. The 50 percent setting is a reasonable default for knowledge work in most markets once benefits, tax and workspace are counted.
  5. Choose an opportunity cost level if you want the figure to reflect displaced work. Start at 20 percent, which is deliberately conservative and still usually enough to make the point.
  6. Read the total and then the per-minute figure, which is the one that tends to get quoted in the next meeting invitation.

Two Calculations Worth Showing to a Team

The first is the default state of the page, and the second is a recurring meeting that most organisations have several of.

Other Ways to Put a Cost on Time

AlternativeNotes
Cost per minuteThe most effective for punctuality. A meeting that starts five minutes late has already spent a visible amount before anything is discussed, and quoting the per-minute figure changes how people treat the start time.
Annual cost of the recurring meetingMultiply the per-meeting figure by the number of occurrences. A 30-minute weekly sync with six people is far more expensive over a year than the single figure suggests, and that is the comparison that gets meetings cancelled.
Cost of one unnecessary attendeeDivide the total by the attendee count to get the marginal saving. Often the practical question is not whether to hold the meeting but who needs to be in it, and this makes the answer obvious.
Fully loaded versus salaryIf you only have salary figures, the result understates the true cost by the whole overhead percentage. Stating which basis you used matters more than the precision of the input, since a reader who assumes the wrong basis is easily an order of magnitude out.

How to Use the Number Without Weaponising It

This calculation is persuasive, which is exactly why it is easy to misuse. It is an estimate of effort displaced, not an invoice, and treating it as the latter makes people defensive.

Meeting Cost Questions

Should I use salary or fully loaded cost as the hourly rate?

Use whichever you are clear about, and say which one you used. If you enter a salary-derived hourly figure, the overhead multiplier should be raised to something like 50 percent to reflect benefits, tax and workspace. If you already have fully loaded internal rates, set overhead to none, because applying both would double-count the same costs and inflate the result.

What exactly is the opportunity cost percentage measuring?

It estimates the value of the best alternative use of that time, expressed as a share of the labour cost. Fifty percent means the work displaced was worth about half of what the meeting cost to hold. It is an assumption, not a measurement, and it is the component to be most careful about presenting as fact.

Why is the equivalence shown in weeks of salary?

Because a total in the thousands is abstract while weeks of a person's time is concrete. The page divides by a fixed internal reference of 5,000 per week, which corresponds to roughly 260,000 a year. If your average cost per person differs materially from that, the equivalence line will overstate or understate the effect, so read the raw total as the primary figure.

Is anything I enter stored or sent anywhere?

No. The calculation runs in the page and there is no submit action, which matters here more than usual because attendee counts and salary rates are sensitive internal figures. Nothing is transmitted, nothing is stored, and the fields reset when the page is reloaded.

Last verified: October 3, 2026

Launch Meeting Cost Calculator

All Tools · All Tools · About · How We Test · Contact · Privacy

Maintained by Huang Bin · Last updated October 3, 2026

Loading Vue Application